Monday, October 21, 2013

A Few Short Questions... Elongated...

I've received a few comments that merit response as it may help some additional facets of my job.

In no particular order.

Who introduced me to the dogbone?

My Deck Chief did at my job training on the first day I arrived at the theatre. I had one (not the one pictured) with a straight handle that I started with for lack of equipment dispersal. This quickly became remedied by request of the Deck Chief, thus the one pictured currently came to be in my use. The origins of where exactly the idea for the PA's to have the dogbones is somewhat unclear it is safe to venture that since Bill has been choosing the attachment hardware for scenic units that he may be the one who originally started wide circulation of them. They can also be used in the lighting world, though there are specific lighting wrenches that do the job even better. Definitely worth looking into purchasing at UWM.

Prop Storage? Where the heck is it?

Prop storage is in Bravo. Bravo (down the hill near the staff parking lot) is where the prop shop is housed as well as our administrative and stage management offices. When we strike a show's props we load them on the back of our truck (Fancy, yes it's the truck's name) and take them down to the shop, or Harlan's shop (he's our finish carpenter who also builds a good deal of difficult props). From what I've seen of prop storage it is fairly extensive, there are entire sections of storage that I've never seen. One of the more prevalent things that I do see on a regular basis however is a casting of a "dead" Brian Mani... Really very charming late at night...

A rough transition into our next question is what are our rain procedures?

We specifically have weather tracking equipment on site that stage management is constantly looking at to plan our days accordingly. Most of the time we do play in the rain as long as there is not a threat to our actors or crew (namely lighting or extreme weather conditions). Sometimes there may be rain delays to the house (it never happened this season, we changeover in the rain frequently) or hold the actual production. Props, this is specifically for you Sandy, are covered with tarps or brought inside when conditions take a turn. If they are damaged, or mold or mildew we attempt to inform the shops through stage management or address the situation as best possible. Most of the equipment like lights and speakers are weatherproofed to some degree so we leave those out.

The "sail" thing?

That is what we like to refer to as the chute. It is a third of a jeep parachute that is hoisted up at six points on our lighting towers and one point on our permanent structure. After the initial point on the permanent structure the ropes from the lighting towers are tied on and hoisted up, lashed off, and excess rope dressed (this was a huge bane of my existence).  It is a necessity for our actors during warm conditions and shades the stage (it helps parts of the audience sometimes too but it's less for them). We set it up for all shows up the hill during the day (it doesn't effect lighting that way) when it is deemed necessary (wind is not too high, it's not raining, it's too cold, etc.)

Hope this clarifies a little more of the posts that I've already posted.
Metalworking Seminar

Another of Bill's seminars that was of particular interest to my coworkers and I was metalworking. There was a day before I arrived that he went over the basics of welding two pieces of steel together with a MIG welder (a skill I already possessed).

In this sort of part two of his seminar he went over some of the cutting tools that can be used to shape steel. Namely he taught us safety and working procedures of a horizontal bandsaw, a miter saw with lubricant and a diamond blade and a plasma cutter. As well as cutting steel we learned a few different bending techniques with a bending machine and the simple route of using mandrels.

Safety is important so he started by making sure we were wearing proper protective goggles (welding and plasma cutter) and safety goggles for the saws. We also wore welding smocks and gloves while handling hot steel as well as ear protection.

First we started with the horizontal bandsaw. This was a saw equipped to drop at an adjustable rate to slowly cut through steel at any angle desired. While it took some time to cut through the steel it was beneficial because it made very clean cuts that did not need to be ground down to make attachment points (also very handy for cutting legs).

The miter saw was similar in structure save for the process require a person be operating the throttle on the saw. This saw was lubricated to assure a clean and relatively fast cut (not too much friction). A good option when cutting needs to be done with a good degree of accuracy as well as be time efficient.

The plasma cutter was a particularly interesting tool to use as it uses some of the same principles of welding steel together to burn it apart. The machine was a small miller plasma cutter that used compressed air and an arc from a ground attached to the piece of steel to cut. You have to hold it about an 1/8" away from the steel you are cutting and drag the torch relatively fast across the steel to cut it.

The bending mechanisms were fairly simple. The bender used a clamp and a series of dies that you rolled steel in between, while compressing the clamp to create more of a curve. The mandrel was the same principle save for you had to rely on the mechanical advantage of your own two hands. In this case we were just bending rings out of pipe and smaller rods (respectively) for practice.

Overall it was an educational experience that I'm glad I now has some base familiarity with.
Design Seminar

I have to preface this post by saying as things are winding down and more shows are closing we get to spend some educational time with some of our higher ups. Specifically Bill our TD gives these seminars to the P.A.s to get our input on how he can better understand our process and build sets that are functional on multiple levels and to help us further our learning of things we are specifically interested in.

This particular seminar we were given a designers first scenic renderings of a production of Henry V. Then asked to come up with some possible problems we could find that would have to be considered during the revision of the design.

The set consisted of two large clusters of raked platforms on stage right and stage left leaving open stage floor in the middle. I found some production pictures of what the actual play looked like for reference:

http://americanplayers.org/assets/documents/King_Henry_V_Abstract.pdf

We primarily used the ground plan to determine where the structural issues may be. Some potential issues we came up with included: material of the structure, division of platforms, delegation of leg or gate system, making allowance for swelling, making plugs around the permanent structure, height of walls and interaction with lighting positions, assessing rake (if there was too much). I'm certain there were more as well.

We presented these first to Bill who tended to agree with our assessment and tell us how it was done the first time (the show was remounted). He told us the set was a hybrid of materials, both wood and steel that started out as a system of knee walls, platforms and plug system. The initial system didn't work too well because it was cumbersome to make attachments to.

The second time around they used a more solid state platform system that was modular. While heavier it took less time to make the attachment points and took less time to plug without having to worry to much about the rake.

The large thing that Bill highlighted however was the budget and time management aspects of the two different attempts at building the set. He said that the first time it was much faster and cheeper to build but with the trade off that it was hard to build consistently the same. The second set, while it took more labor and money in the shop (as well as more storage space in the clubhouse) was a good deal easier to consistently get built fast and accurately.

In the ways of critical thinking this was a particularly interesting exercise for me because of the fact that as a PA I often find awkward scenic units that could possibly have been engineered differently to alleviate problems. It was nice to see all the consideration and thought put into how I do my job and nice to find out that our arguments don't fall by the wayside.

Sunday, September 29, 2013

This is a quick video showing the Up the Hill changeovers we've done this season. All credit to Phil Wooding, one of my bosses and the Sound Engineer here at APT.

http://www.youtube.com/watch?v=QioTFU8-hBM

See if you can spot me!

Saturday, September 28, 2013

Striking and Closing Too Many Husbands

Too Many Husbands was the first of our shows to close this season. It was our third to open. This particular show required all of the P.A. staff backstage with the exception of me who ran the sound board. It was a heavy show for props, specifically furniture. As such it had a fairly significant amount of distress on the scenic units, especially the large cityscape flat which I know I've previously mentioned, which brought up the question of what scenery was going to be used.

Directly after the show I had to strike all my sound equipment like normal save for retrieving a wireless receiver and speaker hidden in the baby prop. That was strike for sound and then we did changeover into 2 gents for the next day. The real trick after that was to load all of the larger props, namely furniture, onto the truck and drive them to the prop shop. Now we had to pack a bedroom ( a queen size bed and bed frame, 3 chairs, a desk, small fire pit, a vanity, a pouf) a full kitchen (stove, table, 3 chairs, 2 stools, a large sideboard), a living room (a sofa, 3 chairs, coffee table, small table, and a stove). Oh, and it was raining so we had to cover everything in tarps. It was a gigantic game of helterskelter tetris but we fit it all in on one load.

The scenic strike was broken up a little bit differently because we weren't absolutely sure what was going to the burn pile (most scenery gets burned then whatever is left, mostly steel is salvaged). We organized it such that it was easily accessible for Bill and Nate (TD and ATD respectively) could decide at a later date. They ended up burning the main walls and windows and transporting the cityscape down to the shop for outside projects.
A PA's Best Friend


Friends let me introduce to you the indispensable tool of choice for a PA: 
The Dog Bone.

This precision instrument is a ergonomically curved ratcheting wrench capable of loosening bolts with a head the diameter of either 9/16" or 1/2". It is used on a daily basis. Specifically, the 9/16" is used on all the scenic units Up the Hill and the majority of them in the Touchstone. The primary reason this tool is so important to us is because almost every scenic unit is large enough to require some variety of bolts. It's curved shape helps fit into those tight corners where pesky bolts are hidden. Whether that is a modified stage screw or an assortment of regular bolts it is assured that a dog bone is behind tightening it. It is often used in conjuncture with box wrenches, of the 9/16" variety as well, drift pins, dead blows, screwguns, multitools, and a good amount of good old fashioned human leverage.  It's very durable which is a good thing as it's often used as a hammer as well. Platforms, walls, railings, stairs, are all bound together by the tightening prowess of the bone.

Jokes and specs aside this tool really is indispensable in my day to day duties. It makes bolts quickly without too much hassle and doing things quickly is an essential part of the P.A.'s job. The ratcheting function and the curved handle in conjunction with each other create a versatility that is indispensable on the fly.

Tuesday, September 17, 2013

Woof!

Time off and going back to school... What a week...

Had a huge weekend last week, as it was the last weekend we had all shows open. There were a few changeovers that had to be done quickly but we've gotten in such a rhythm we've been able to handle them efficiently.

The real trick has been weighing all my commitments with never being at school.  Financially things have been reigned in more than ever.

Getting away from all of that.

I was left a comment asking what could be improved here. So here is my answer to that:

I think the largest thing that is problematic for me is scheduling. Sometimes shows are set up then taken down immediately, only to be put back up again. It has to also be considered that during rehearsal and tech that we have a different set up (maybe putting up the chute or waters). The production assistants almost never know specifically when they will be needed until about 12 hours beforehand, if that.

I would say the fix for that is to have better communication between different department heads but that already happens. I think more than anything else it's just a reality that happens because of the nature of the job description. I don't really want to get into the hypotheticals of narrowing a job description and or hiring more staff because that's just going to create new problems. It's a necessary evil and it works but it is still a pain for everyone.

Another thing that needs mention is the specific packing of the clubhouse. It's packed incredibly tightly at the height of the season with all shows running and it creates issues when we start doing multiple show days. Sometimes we have to assemble specific pieces of a set before a tear down and set up on a two show day. For example when the Hamlet and R&G wall was new it took a long time to put together so we assembled pieces of it in the clubhouse. Not only is it a lengthy process that consumes a lot of space it also changes the dynamic of what is expected of the changeover. Another important piece of information I neglected to mention is we have extra hands helping on the large changeovers like that. We get acting apprentices that aren't busy with shows.

In short, this all leads to a myriad of problems that are fairly unpredictable. The added space, should it be added, would alleviate some of the need to assemble and disassemble the pack. It would also help with traffic flow onto the stage and allow larger scenic units to be stored easily.

I'm sure there are more things that I will think of in coming days but these have been in my mind for some time.

We start student matinees this week so the ever changing process continues.

Also worth mentioning is that PA requests have become more frequent as the season winds down. We've moved out apartments and also done a few maintenance requests. I painted a porch with two of my coworkers today.

I have a number of posts to put out soon as I'm trying to catch up on the old blogging (mostly just tidbits about my most used tools or running shows).